Approve the system before delivery
Confirm the product designation, substrate or matrix, design drawings and installation instructions. Establish who approves mesh position, overlaps, fasteners and edge details. Check that the delivered format can be moved through the site and stored under the supplier’s recommended conditions.
Check the delivered material
Inspect packaging, labels, dimensions and visible damage. Keep batch identification with the delivery documents. Do not install material with unexplained cracking, distorted junctions or damaged fibers until the supplier has reviewed it. Use the handling protection specified in the product safety documentation.
Maintain position during work
Use the supports, fixings and preparation method required by the approved system. A mesh placed at the wrong depth may not serve the intended purpose. Coordinate installation with the placing or coating sequence, and arrange inspection before the mesh is concealed. Take photographs that identify the area and batch.
Resolve changes with the designer
Do not select overlap length from a generic online rule. Cutting, bends, penetrations and changes in mesh direction may require specific details. Ask for approval before substituting mesh dimensions or materials. Retain as-built records, supplier instructions and acceptance documentation after completion.
Sources & further reading
These publisher resources support the terminology and scope distinctions in this guide. They are independent references, not Yuanda certificates.
Browse the technical reference library ↗Source review: 10 November 2026. Consult the publisher for the full document and any subsequent revisions.
Published Yuanda product reference
The epoxy resin mesh product page lists grid sizes from 50 × 50 mm to 300 × 300 mm, with selected bar diameters from 2.5 to 10 mm and custom widths of 300–3,000 mm. Compare the exact listed combinations and review available documents.